How much wastage we considered for cement
Answer Posted / srikanth
3% for steel and 2% cement
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
In earth work 1300 cum soil how to calculate how many liters require in water
Formula of mid span bar
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
what is the maximum number of course that can be laid according to IS code and the max height.
what is meant by shear center?????
how calculate the bearing from two coordinates?
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
Dear Sir What is the Contraction joint for base Slab
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
What are the advantages of cad?
what is the coefficient for running feet to cft coversion both area and price
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
how to calculate valuation for the old building?
Process of pcc in wateredug
Wat is meant by Aecron brick?