the coefficient of curvature for a well graded soil must be
inthe guage
0.5-1
3-4
4-5
none
Answer Posted / pradeep pidige
4.1D
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is diversion tunnel in a dam?
Civil engineering material testing Standard results
acceptance criteria for concrete works
Explain the various stages of the project planning process in construction?
In cement making,what is meaning of blend,fineness,density.
Which tests are performed on soil to decide the type of foundation to be provided.
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
What are the phases inspections are done by local authority while construction?
Discuss some applications of modular elasticity?
What are the advantages of cad?
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
Explain the design for rcc multi-storied building?
Which brick is best for construction ,either fly ash or AAC BLOCKS