Answer Posted / ak
To bring the pressure(potential coil) in the main circuit for measurement of power.
| Is This Answer Correct ? | 17 Yes | 2 No |
Post New Answer View All Answers
why constant voltage transformer should be start without load? and if started then what will happen?
Please provided formula for calculate the cable size from step up transformer to M.V panel, run overhead aluminum cables, total load is 5mega watt, total length 900 feet.
is it possible to start a motor in felid connected to a remote mcc
sir plz send some previous year questions of jspl.
what is earth-fault?when it occurs? to check where it occurs what type of test should we do?
if 3400kw slipring motor rotor shorting done and motor started on mv drive ,what will be the rotor shoring current
please tell me, how i clear the objective test? when i studied form the one book after i solved the objective ,that time i solved that qes. but if i tried solve objective form the other book then i could not solved these que.
WHAT IS THE TECHNICAL SPECIFICATION OF C CURVE & D CURVE LEGRAND MAKE MCB
what is the minimum recommended leakage current of an earthed cable connected to the body or skid of an alternator
what happen if field of dc shunt motor opens? what is function of putting res. in parallel to one phase of 3 phase IM? the power supplied by 5A source in circuit is given by------Watt.
what is accuracy ? in any meters , coils accuracy . how can u defined that ?
A 400KVA transformer has 400 Hz frequency. If the frequency is changed to 50 Hz, then what will be the new KVA rating?
what is ground fault in ACB?
how to copy from plc ge fanuc versamax series,all input and output, adress, and printout.
what are the accessories need to be added while doing estimation for the following: 1.MCCB 2.MCB 3.ACB