how many brick in 1 cubic meter with mortar ?
Answer Posted / amalvijay
The quantum of Bricks with CM is ~ 450Nos in 1Cum.
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
significance of specific surface area of particles?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
how many kg of 20mm, 10mm, dust available in one ton stone boulder
What is the ideal size of the living room ranges from small to large size?
Whats the meanig of ,'K' VALUE in the case of soil.....
How do we test on design and style in a software?
What do you understand by “preset” during the installation process of bridge bearings?
What is bmc stands for in bmc software?
what is the method used for marking of cantilevers in hirise buildings by using theodolite
Which stone is best for wall construction Laterite Stone or Cement Blocks
What is the outturn of Ceiling plastering
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
What is the biggest dam in america?
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
Basic questions of civil engineering