Answer Posted / asif
by multiplying the uld with total span of the beam i.e for example udl is 2 kip/ ft & beam span is 30ft .then 2*30 =60 kips & it will act at centre i.e 15ft from both of the supports
| Is This Answer Correct ? | 35 Yes | 3 No |
Post New Answer View All Answers
What is costing in 100squre feet bricks
What is a projection line?
The largest size of paper used in plotter to print the drawing made by Autocad .
What is the per cu. mt. price of ready mix in Gujarat region.?
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
Explain what is progress payment?
Who designed the city of washington dc?
what is right & short method of measurement of slab&beam
What is oneside mat. And explain
What are the ingredients of pre-stressed concrete?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
what is the meaning of degreasing of the euipment or line.
what is polity
how calucate cement sand ratio for plstering