what is fe 415 steel
Answer Posted / ajinkya
What is the meaning of Fe in Fe415 grade reinforcement steel?
Updated Answer
The abbreviation Fe stands for Ferrous material ie iron from which the reinforcement steel bars are manufactured.
The reinforcement steel bars used in RCC (Reinforced Cement Concrete) are designated in grades of Fe250, Fe415 or Fe500 depending on their Yield Strength. (The numbers 215, 415 and 500 tell about this Yield Strength in N/mm2 the bars are designed and manufactured to have.)
Fe415 indicates that the Yield Strength (tensile strength when it is subjected to elongation) of steel is 415 N/mm2.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
what is tension footing?
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
What are the benefits of rcc pipes over steel designed pipes?
What is meant by autocad?
Define What is diversion tunnel in a dam?
Design a rectangular channel.
Why is concrete cube test carried out?
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
How to find permissible diagonal tensile stress in reinforced brick work
suppose that  156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
What are the different approaches in designing the floors of the service reservoirs?