Answer Posted / ashwini
In vertical member such as columns etc which are supported by the shuttering and the base of the beam etc are supported by centering.
The shuttering can be removed by two or three days but the centering can be removed by only as per the days of beam.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
important question on stones
What are the advantages of building a dam on the river nile?
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
What is the ideal size of the living room ranges from small to large size?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
How is calculate the cube molt
What is a bearing capacity of soil?
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
how to calculate reinforcment in staircase cranked beam?
How can I make justification between using concrete grade c35 compare c37?