What is the unit weight if concrete?.
Answer Posted / bhavesh patel
1.00 lcm concrete means
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
How long does it take concrete to harden?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
Why is concrete cube test carried out?
What are the uses of alloys in daily life and how are alloys made?
types of laps in column
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Explain moment of inertia and its importance.
what is the steel difference between np-2 and np-3 pipes and weight also
Define What is the origin of name Railway Sleepers?