for mortar 1:18 how much cement and sand required for 1 CM
Answer Posted / shanmukh
cement:1.5 bag
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How to calculate chejja reinforcement
though u r a civil engineer, y r u interested in tcs???
Define line type?
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
how to preaper for interview wat they asked in interview give me idea
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
How can we make a hole in a solid rectangle using solidsworks?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
Why the finite element method is lower bound solution?
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
Why do you want to work here