Meaning of civil engg. in hindi
Answer Posted / vikrant
Janpad abiyanta
| Is This Answer Correct ? | 8 Yes | 2 No |
Post New Answer View All Answers
can stub column take the load as main column
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
how to calculate steel for slab or footings?
why do we not deduct volume of steel to find actual volume of concrete in practical???
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
What is horizon or horizontal mining?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
what is a well
Wats the formula of eccentric footing and how was calculated from concrete qty
how do you stabilize a waterlogged area in road construction
Define absolute co-ordinates?
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
Define graphics window?
In the roof of a pumping station explain briefly the components of a waterproofing system?