What is the difference between Wraft and file foundation and where these are used ?
Answer Posted / surajitg
If load of the structure is not huge enough and need not a deep foundation but the quality of soil also not very good in a shallow depth then we go for raft foundation. Where the load is quite high and need a good bearing capacity then we go for pile foundation.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
How to find the cuplock pipe qty in staging for Minor bridge?
What are the basic use of runners and standards of pipelines?
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
what is hydrostatic paradox?
What is dead load impact load live load
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
In earth work 1300 cum soil how to calculate how many liters require in water
What are the methods of measurement? Describe it shortly
what is pqc
How can you produce desired alloys and discuss their applications in daily life.
pls tell me , what is the water content
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
Define What is unit weight of normal concrete?