If the first roof slab is not deshuttering in this time shall I start column raising work in second roof is it correct or not
Answer Posted / surajitg
Yes from the very next day you can start work over the roof for the next floor. Provided you take care of the newly concreted surface from getting damaged and water ponding for proper curing.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
What is M40 _ TOR - EQ and B.F.S
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.
How to calculate steel for beam slab and column
how to design and calculate materail quantity for concrete speedbreaker ?
why do we provide haunches in rcc box or underpasses?
How to come 1.54 from dry to wet concrete?
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
what is differences between ferrock and concrete ?
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
what discoveries did you have in relation to your course?
why the openings of sieves are square io size?
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
Can we use the flyash bricks in brick bat coba?