Answer Posted / ali a.
SCADA (supervisory control and data acquisition)
a computer system for gathering and analyzing real time data. SCADA systems are used to monitor and control a plant or equipment in industries such as telecommunications, water and waste control, energy, oil and gas refining and transportation. A SCADA system gathers information, such as where a leak on a pipeline has occurred, transfers the information back to a central site, alerting the home station that the leak has occurred, carrying out necessary analysis and control, such as determining if the leak is critical, and displaying the information in a logical and organized fashion. SCADA systems can be relatively simple, such as one that monitors environmental conditions of a small office building, or incredibly complex, such as a system that monitors all the activity in a nuclear power plant or the activity of a municipal water system.
Eng ali
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how a definite tx line can acts as indefinite tx line
"11101111" when that bit oriented message transmitting from sender to receiver.how is it calculate parity bit and how is it show bit stream that would be transmitted..by even parity error detection scheme..pls send me an answer..very important,,
How WDM works in wireless system...as we say that it works in optical and signals transmitted in this are light signals...??
Where will digital and analog technology come into play in the cctv technology in terms of data storage?
The magnitude of electrostatic force between two identical positive ions that are separated by a distance of 5.0 x 10– 10 m is 3.7 x 10–9 N. (a) What is the charge of each ion? (b) How many electrons are “missing” from each ion?
Explain what are semiconductor devices?
What is the formula for power gain when input gain & output gain is given?
What is satellite cooding in telecom transmission system?
how to charge for Annual Maintanence
What is fbus protocol?
Explain how to convert binary to gray code and vice-verse?
List the parameters that should be considered for ac and dc applications.
How to Create the HWC file with 2+2+2, 4+8, 6+6 Configuration (manually Cabling)
i m selected in AAI JE. my interview is on 25 sept. 2010. i don't hv any idea abt aai interview. can anyone help me, i want to know interview qus of aai. so pls help me... my e-mail id -- mailmanish_kumar@yahoo.co.in
what is the purpose of joining engineering?