how much M-25 steel reinforcement per cubic meter in commercial building as per IS code
Answer Posted / krishan kumar
125 kg
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
Which is the most prominent tower of world?
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
What are advancements in civil engineering?
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
how to find quantity of concrete in PCC M15
What is soil enforcement?
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
what pressure the NP2 class RCC pipe can sustain?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day