adspace
How do you measure the centring work
Answer Posted / pramila raj
Centring is a type of falsework: the temporary structure upon which the stones of an arch or vault are laid during construction. Once the arch is complete, it supports itself, but until the keystone is inserted, it has no strength and needs the centring to keep the voussoirs in their
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
HOw much % of premium on DSR-2013 currently
can i get civil engineering test papers.......?????
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
400 ku d/c clearess ketan hota hai?
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
what is the difference between replacement of cement by groundnut shell ash
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?