How do you measure the centring work
Answer Posted / pramila raj
Centring is a type of falsework: the temporary structure upon which the stones of an arch or vault are laid during construction. Once the arch is complete, it supports itself, but until the keystone is inserted, it has no strength and needs the centring to keep the voussoirs in their
Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
What is reinforced concrete?
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
what is your role of in previous company as a construction manager
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
Which are the top apps for you civil engineering?
how much to get of BRC lapping in full yield and half yield ?
How do you compute volume of airflow?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
Which percentage of carpet area use in plot area of office building.
how many kg of 20mm, 10mm, dust available in one ton stone boulder
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
what is the basic difference between Coloumn & Shear Wall
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.
it is a corrected question." make a list of engineering property(properties) of soil.