what is the quantity of cement( in bags),sand and aggregates required for 1 cmt of M 25 concrete
Answer Posted / vikas d v
m25=1:1:2
for 1cum add 50% for wet mix so 1.5cum
1.50/4=0.375cum
for 1cum=1440/50=28.8 approximately 30bags
cement=0.375*30=11.25bags
sand=0.375*1=0.375cum
aggregate=0.375*2=0.75cum
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
What is progress payment?
What are the main reasons for conducting pull-out tests for soil nails?
what is tension & compression of steel bending.
what is the steel difference between np-2 and np-3 pipes and weight also
explain the rale of the government in the construction industry
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
residential buildings,mixing of concrete,structural,construction material,site handling.
how we can find sieve #4 is 4.75mm?
what could be the production cost of 1 cum of concrete by CP30 plant
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
How do you maintain water pressure?
How many pyramid in egypt?
What difference comes in constructing of house and a housing complex like society