When you received a RA Bill of contractor at HO duly checked
and certified by Site In-charge, How to know at a glance it is
complete in order, do have any one checklist format in this
regard.

Answer Posted / vikas d v

every Ra bill have previous and present amount to be paid if its typical floor or if u know the quantity of items u can easily know

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How many bricks are there in 100cft?

831


What is limit state method and working stress method and ultimate method

1130


What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.

1841


what is civil engineer greatest strength and weakness?

13364


.5Ast

1337






What are the problems one might face while having a Cantilever balcony?

1033


I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,

1505


can i get hindi version of is codes based on civil engineering?

3874


as per is code, what is the minimum content of opc and ppc cement for rcc structure

1737


Describe Briefly The Various Methods Of Concrete Curing?

665


What is componsation

1434


how many time use of plywood shuttering and IS code

2684


the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum

1620


what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter

2018


what is modular brick and it size

1160