When you received a RA Bill of contractor at HO duly checked
and certified by Site In-charge, How to know at a glance it is
complete in order, do have any one checklist format in this
regard.
Answer Posted / vikas d v
every Ra bill have previous and present amount to be paid if its typical floor or if u know the quantity of items u can easily know
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How many bricks are there in 100cft?
What is limit state method and working stress method and ultimate method
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
what is civil engineer greatest strength and weakness?
.5Ast
What are the problems one might face while having a Cantilever balcony?
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
can i get hindi version of is codes based on civil engineering?
as per is code, what is the minimum content of opc and ppc cement for rcc structure
Describe Briefly The Various Methods Of Concrete Curing?
What is componsation
how many time use of plywood shuttering and IS code
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
what is modular brick and it size