Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why gray colour is choosing to all instrument panel.why not choosing other colour?

Answer Posted / carl_ellis

The color Gray is used because it is a neutral color.

One consideration in the selection of color is heat dissipation.

IEEE published a paper by Ralph H. Lee at E. I. Du Pont (1975), The Effect of Color on Temperature of Electrical Enclosures Subject to Solar Radiation by Effect of Enclosure Color and Finish, which is summarized by the extract:

"Electrical enclosures have historically been painted with dark colors ostensibly to enhance the radiation of internally generated heat.

Outdoors, these dark colors are great absorbers of solar radiation, from which the enclosure incurs an appreciable temperature rise. The lighter colors absorb less solar radiation, incurring smaller solar temperature rise. However, it is demonstrated that these lighter colors radiate the lower temperatures of the equipment as well as the darker colors.

Hence, equipment painted with the lighter colors will operate at a lower temperature and be subject to less severe derating from the effects of solar radiation."

Many vendors offer custom painted enclosures.

Carl Ellis
Measure First

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Please tell me details about Sox,Nox,SWAS analyser????

3728


What are the materials available to prepare individually for competetive exams in Instrumentation field? Plz reply...

2090


Where Can i take a SPI INtools training in Mumbai? In Rolta India Ltd to whom I should approach regarding of SPI INtools Training?

2785


how can i check vortex shedder bar it is ok? if there is ohms condition are shown correct?

2223


1- Explain about HPM 2- What is the FSC and explain the configuration of FSC 3- explain the complete loop of vibration, how it works (field to control room) 4- What is the use of proxymitter? 5- During job your partner effected with H2S then what you have to do. 6- what type of gland packing uses when valve glind is leaking.

2812


How earthing can be checked????

2407


why we take %i0.0 as input for twido plc

2175


What is instrumentation control?

1162


what different types of problems do occur while doing instrumentation commisioning and how to solve them? please explain in detail

1761


what is insdustrial vibration.who it works. give atleast 2 types of insdustrial vibration

1975


what is maxdna ?. explain about the software details.

4382


what is gas metering system? gas chromatograph? and gas compressors?

2454


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2174


Explain the working principle of lvdt?

1198


How to calibrate the flow transmitter

1610