What is the volume of sand in per cubic meter if we have a design mix of concrete is 1:2:4 (by volume).
Answer Posted / saurabh dhanotiya
M15-1:2:4
Total volume-7
Cement required-(1/7)*1.57=.224m^3
Density of cement-1440*.224=322.97 kg/m^3
No of bags-6.45~7 bags
The standard volume of dry mix mortar..1.57
Can check if in it code also
Sand required-(2/7)*1.57=.448×1600=717 kg/m^3
Aggregate required-(4/7)*1.57=.897*1500=1345 kg^3
Water-150-180litr
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Explain what is the release of lien?
How many are the types of joints?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
How and where are aqueducts built?
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
what is the meaning of 40/20 src
how water proof chemicals act in concrete to avoid leek?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
What is missing report and how to prepare
What quantity of 1.0 m3 bricks required?
How to find CN by using arcgis 9.3?
how much percent are used 20mm,10mm?
What is the cost difference between site mix and ready mix concrete per cubic meter