What is the volume of sand in per cubic meter if we have a design mix of concrete is 1:2:4 (by volume).
Answer Posted / saurabh dhanotiya
M15-1:2:4
Total volume-7
Cement required-(1/7)*1.57=.224m^3
Density of cement-1440*.224=322.97 kg/m^3
No of bags-6.45~7 bags
The standard volume of dry mix mortar..1.57
Can check if in it code also
Sand required-(2/7)*1.57=.448×1600=717 kg/m^3
Aggregate required-(4/7)*1.57=.897*1500=1345 kg^3
Water-150-180litr
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Questions related to civil.engg in company
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
how to calculate the weight of concrete
what r you reqired for concrete baching plant?
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
What do you mean by the word 'shear'?
how do you calaculate the total steel quantity of an rcc building using thumb rule?
what are the layers of the national and heir aprox thickness??
What are the different types of runners?
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
what are the changes in concrete pour height as per IS 456, 2009?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
How to calculate carrying capacity of the existing water supply trunkmain
What was asked in isro civil interview