what will be the cost of constructing a plinth of (40x40x4)ft and a PCC layer of 4 inches?
Answer Posted / khalid
Rs 1,00,000 to Rs 75,000
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
what is your role of in previous company as a construction manager
Explain the mechanism of cavitations in pipes and drains?
sir please send me campus placement questions in civil engineering
what is the construction cost for per cft of multistorryed building in kolkata?
undistributed samples are obtained by
what is Brick crushing strength(PSI)?
What is the difference between absorption & adsorption and sorption?
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
what is cement wastage percentage in NHAI ROAD WORKS
What is the use of extruded feature in solidsworks?
What are the techniques to measure road difference?
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
how to estimate material requirement for an area of house in square feet?