what is difference between long column and short column?

Answer Posted / tasleema

if effective length of column/least lateral dimension is <12 then the column is short one for long column it is greater than12

Is This Answer Correct ?    38 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to design staircase.plz tell me formula for the design the staircase.

1397


Which percentage of carpet area use in plot area of office building.

1386


What are the responsibilities of a site manager?

619


how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.

1560


why +1 to be followed for calculating the no of bars in BBS. Please explain

1506






What are the advantages of building a dam on the river nile?

630


What is packing Factor ?

989


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

1653


how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you

1499


rate analysis for cement pointing 1:4 , for 100 sq m

3687


I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??

1883


What is meaning of FREE STANDING STAIRCASE ?

2483


What are advancements in civil engineering?

643


hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?

1953


Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire

1148