Answer Posted / m dawood
The morter for brick is (25-28)% volume of total volume of the brick structure
After finding volume of morter we can find the quantity of cement from the ratio of morter mix
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
What are the different softwares used for cad?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
How many axes do cartesian coordinate system has?
is basic cost of the material includes tax?
what is the construction cost for per cft of multistorryed building in kolkata?
what are the types of design? which type of method is used at what type of design & why?
how much shouid be the rate for ready mix concrete per cubic meter
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
detailed calculation of the amount of cement used?
How to determine thee cut length for steel reinforcement bars in R.C.C design
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order