what is the formula to calculate costing of rubble soling and wbm in road works?
Answer Posted / arif sayed
what is the formula to calculate costing of rubble soling and wbm in road works?
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
What Are The Different Type Of Slump Test Indications?
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
what would be the design load of R.C.C Cooling tower per cell.?
what is mc arther pile?
What is hybrid foundation?
How to calculate the load of partion in flat slab if we use brick?
how to calculate the length diamond shaped striupps in column
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
What are the uses of alloys in daily life and how are alloys made?
Time required for curing of wall tiles before fixing
1m square 20mm plastering how much of water need curing work
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
how u design STAGING for Superstructure in BRIDGE construction?
how pumping of concrete effects the quantity of material used in it?