how to calculate concrete qty for footing using M25 grade
1:1:2 for 731 cft.
Answer Posted / pushparaj
How much cement bags required (m-25 grade) for 1000cft
And also how to calculate
Thank you
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
Explain what is structural frames or systems?
Define block?
cause of cylinder test failure
what pressure the NP2 class RCC pipe can sustain?
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
What expenses counted in contingencies and how much it is in related to built-up area of the building.
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
What is gravity flow?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.