Answer Posted / soul
Civil engineer is mostly a donkey
Is This Answer Correct ? | 5 Yes | 8 No |
Post New Answer View All Answers
What was asked in isro civil interview
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
How to calculate carrying capacity of the existing water supply trunkmain
What are the different types of runners?
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent
how we can find sieve #4 is 4.75mm?
What is Gsb tollens ?
what is meant by csr in foundation? what is sbc?what is meant by contour line?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
can you give me the details of rate analysis of steel and concrete?
what is the function of GSB all class ?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
Who designed the city of washington dc?