Answer Posted / chinmay kumar patra(npti)
In case of high pressure turbine specific volume is less so single pass design performance is satisfactory so no need to further reduce the size by double flow designing.that's why in
super critical power plant IP turbine is also single flow type.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
By any way can we increase the B check hours from 300 to 500
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
what is the meaning of SST300 V56A in SIEMENS turbine
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
How We Calibrate the vaccum transmitter?
what is the difference between compensated & normal drum level in boiler drum?
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
what is natural frequency of turbine shaft .
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
operation
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
what is the basic use of power plant in equipment
why do you consider yourself a suitable candidate for this position
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.