What is the compressive strength of noramal clay bricks and AAC bricks??. which one is better for load bearing wall//
Answer Posted / sudarsan
first class bricks- 70kg/cm2
2nd class bricks-35 kg/cm2
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What are the benefits of rcc pipes over steel designed pipes?
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
what is the meaning of 40/20 src
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
wat would be the probable interview questions and GD topics for IOCL exam?
Questions related to civil.engg in company
material used for mendrel use to bend epoxy coated rebar
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
What is the absolute pressure scale?
what is your role of in previous company as a construction manager
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.