what is M & 20 of M20 concrete
Answer Posted / surjit
M means mix design 28 days after curring 20n/mmsq called m20
| Is This Answer Correct ? | 6 Yes | 3 No |
Post New Answer View All Answers
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
The largest size of paper used in plotter to print the drawing made by Autocad .
rate analysis for cement pointing 1:4 , for 100 sq m
What is the diameter of the 3"inch nails?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
What is Refuse Area In High Rise Building ?
Explain creep?
what is the productivity in aluminium shuttering per day
how much to get of BRC lapping in full yield and half yield ?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
What are the causes of building collapse?
How to calculate volume of concrete & steel on tank foundation & ring wall ?
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
what is m30 in concrete tiles
What is oneside mat. And explain