what is M & 20 of M20 concrete

Answer Posted / surjit

M means mix design 28 days after curring 20n/mmsq called m20

Is This Answer Correct ?    6 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

150mm bricks size how many use 4.14 m3

1399


How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?

1795


for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete

1466


What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????

2346


How will you Engage Labours on Site?

1400






Will going from a 3-tap to 6-tap increase water pressure?

640


What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?

4641


List out the types of roofs?

665


What is the method of soil replacement test?

1537


what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon

2326


I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.

2040


can any one explain bar bending schedule of bems and columns and slabs ??

1404


how to caluclate sienerge qty in construction in ap

1889


load combinations how many types for staad design purpose?

1722


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1669