what is M & 20 of M20 concrete
Answer Posted / surjit
M means mix design 28 days after curring 20n/mmsq called m20
| Is This Answer Correct ? | 6 Yes | 3 No |
Post New Answer View All Answers
What are the advantages and disadvantages of using plastic and timber fenders?
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
What is the difference between built area and super built up area?
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
Minimum concrete cover in slabs, columns, beams, foundation and other st?
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
What are the different approaches in designing the floors of the service reservoirs?
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
How to increase a bearing capacity of soil?
Explain what is 1/8 on the architect ruler denotes?
types of laps in column
Technical Question of Civil Engineering
How do you calculate reinforcement weight of steel?