What is mean by grade of steel?if Fe 415,Fe500- what is this 500 and 415 denotes?
Answer Posted / yasien
Fe 415, Fe500 denotes its Yield Strength and not its Tensile.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
Why joints are provided?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097
What is difference between code and standard and specification?
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
how to identify the failure of building by expansive soils
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
What is the meaning of soil reinforcement?
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
What is meant by dimensioning?