What is the technical name for aggregate stored in
trepizoidal shape near railway station.
Answer Posted / suresh phadke
Ballast
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
60-70 grade of Bitumen is VG-30 ?
Dear Sir What is the Contraction joint for base Slab
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent
What in bending moment, if a moment is free end of cantilever beam?
States some of the tool bars used in cad?
How to find out slope footing concrete
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
What is Critical path in Ms-Project ?
what"s the sort of beams?
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
What do you mean by tolerance factor of concrete ?