how many Concrete hollow blocks (6"x8"x16") will one mason and one helper accomplish/Install a day (8 hrs/day)?
Answer Posted / dxb
25 to 30 sqmt of work can done by 1 mason & 1 helper in one day
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
How to testing voids of filled aggregate in bitumen mix design
All aptitude question of Bechtel
what is the formula to find the diagonal shape stirrups?
What is the distance between railway tracks?
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
what is the clear cover for shearwall?
what radial pressure, the NP2 class rcc pipe can sustain?
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
I need old MMUP exam question and answer for Civil engineering