Answer Posted / neelima
An opposed flow high pressure-low pressure steam turbine balances thrust of the high pressure steam turbine with the thrust of the low pressure steam turbine allowing a reduction in size of thrust bearings. Higher stage reactions in both turbines may be incorporated since they are offset with the opposed flow, allowing a higher steam path efficiency. Opposed flow may be established through a cross-over pipe or utilizing a double high pressure shell.
Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
what does mean by kva rating
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
why do you consider yourself a suitable candidate for this position
what is the difference between compensated & normal drum level in boiler drum?
why airtel use + 24 volts and other operators use -48 volt
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
How do you consider that you can improve and what assistance do you need to achieve this
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
Why superheated are started before I'd and rd fan?
operation
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
How to calculate power press toneage
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.