we have one pumping station and 4.6 MW 7 no.s synchronous motors.so there is no required HT capacitor to improve power factor.But we have two no.s of 25 Mva power transformer connect to distribute the power for motors connect with 220 kv line.So i have required the HT capacitor to improve power factor at HT side i mean power transformer bus side.So please suggest how much HT capacitor banks required for same.
Answer Posted / subhra kanta mohapatra
2 nos
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
What is the formula of frequency ?
we have 3.5MVA-11/6KV transformer. how can we calculate earth fault current and NGR calculation?
suri transmission
Explain what is clipper and clamper circuits?
what is relation between ct and pt ratio with multiplication factor of a energy meter? is there any other factor on which multification factor depend?
1 “earthing” for bonding of equipment and circuits to common plant earth electrode potential, 2 “protective earthing (PE)” when this bonding is required for personal safety provisions 3 “grounding” for interference suppressing bonding of screens, sys-tems with ground level 4. low-impedance earthing ? 5.primary earthing system and secondary earthing system what is that? 6.earthing electrode or mesh net earthing electrode ? very confusing , simple but very informative help required ? i will be very very thankful to you guys.
11kV capacitor bank of rating 2.4KVAR, is charged with protective relays of only over current & Earth fault &.......without Over Voltage, Under Voltage & Neutral Displacement Relay. Is it advisable??
what is the best method of grounding in 30 MW generator?
how can i determine the KVA/MVA rating of transformer precisely?? is there any standard test?????
What happen Grid EARTH plat got cut.
explain comutator action in detail.thanks
we can run 2phase as 3phase .what will be the differnce with respect to phase angle, power, current between the two modes
WHAT IS DOL STARTER? HOW IT WORK? GIVE ITS CONTROL AND POWER DIAGRAM .
Which cable is use for rtcc control panel
If rotor works in clock wise what happens