How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answer Posted / md labib arfat
Size of brick =230mmx115mmx75mm volume of brick= 0.00198cum thickness of mortar is 10mm size of brick =240mmx125mmx85mm volume of brick =0.00255 no. Of brick in 1cum =1/0.00255 =392nos. Volume of bricks in 1cum =392x0.00198=0.77793 cement mortar required = 1-0.77763=0.22237cum add 15% for wet mix =(0.15x0.22237) 0.22237=0.255cum add 1/3 for dry volume =(0.33x0.255) 0.255=0.34cum ratio 1:5 cement required = (1x0.34)/6=0.056cum 0.056x1440=80.64 =1.6 bags sand required = (5x0.34)/6=0.283 cum
| Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
What is pre-stressed concrete?
What is the tensile strength of marble?
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
What does a construction cost covers and what does not?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
what is pile and deam foundation
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
what is the use of beam end forces while using a staad ? wha they are show
procedure for preliminary selection of size of column of 5 storey building
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.