Answer Posted / lokesh vrushabh
its not 78.5kg/m3, it should be 7850kg/m3 or 78.5x1000 kg/ m3. it is density of mild steel and this value differ for hysd bars.
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
How long does it take concrete to harden?
How will you reduce the concrete flow after mixing the concrete
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
what is the design procedure for building
What is the average density of soil?
Can we apply curing compound on ceiling (slab Bottom)
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
What is the meaning of a blue land surveyors flag?
How high should the water tank be to provide a 60 psi at base of this water tower?
How to do bbs in excel format
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day