How can we calculate quantity of slab, beam @ column ?
Beam should be calculated by deducting slab thickness or
slab should be calculate in to in ?

Answer Posted / gvb

just take all beams quantity, column quantity and slab quantity.(because slab thickness will be vary room to room like 41/2" to 5") so we have to calculate Beam, column and slab.

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting

1305


how many litres of enamel paint required for 5000 sft of site?? 

1478


What is an ortho mode?

714


Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish

2092


i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??

1635






Civil engineering material testing Standard results

1868


What is thumb rule for deep trench excavation

1316


For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.

1626


Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.

694


What is the material consumption- cement,sand,tiles etc for Toilet dado?

7050


What tor stands for in tor steel?

628


Define What are the uses of alloys in daily life and how are alloys made?

730


Is there any course for billing available in Mumbai? If yes then please mail me the details..

1812


GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.

2032


what is the design procedure for building

1758