what is water cement ratio m10,m15,m20,m25,m30,m35m ,m40
Answer Posted / ketan kumar bhatt
DESIGN MIX:
M10 ( 1 : 3.92 : 5.62)
Cement : 210 Kg/ M 3
20 mm Jelly : 708 Kg/ M 3
12.5 mm Jelly : 472 Kg/ M 3
River sand : 823 Kg/ M 3
Total water : 185 Kg/ M 3
Fresh concrete density: 2398 Kg/M 3
M20 ( 1 : 2.48 : 3.55)
Cement : 320 Kg/ M 3
20 mm Jelly : 683 Kg/ M 3
12.5 mm Jelly : 455 Kg/ M 3
River sand : 794 Kg/ M 3
Total water : 176 Kg/ M 3
Admixture : 0.7%
Fresh concrete density: 2430 Kg/ M 3
M25 ( 1 : 2.28 : 3.27)
Cement : 340 Kg/ M 3
20 mm Jelly : 667 Kg/ M 3
12.5 mm Jelly : 445 Kg/ M 3
River sand : 775 Kg/ M 3
Total water : 185 Kg/ M 3
Admixture : 0.6%
Fresh concrete density: 2414 Kg/ M 3
Note: sand 775 + 2% moisture, Water185 -20.5 =
164 Liters,
Admixture = 0.5% is 100ml
M30 ( 1 : 2 : 2.87)
Cement : 380 Kg/ M 3
20 mm Jelly : 654 Kg/ M 3
12.5 mm Jelly : 436 Kg/ M 3
River sand : 760 Kg/ M 3
Total water : 187 Kg/ M 3
Admixture : 0.7%
Fresh concrete density: 2420 Kg/ M 3
Note: Sand = 760 Kg with 2% moisture
(170.80+15.20)
M35 ( 1 : 1.79 : 2.57)
Cement : 410 Kg/ M 3
20 mm Jelly : 632 Kg/ M 3
12.5 mm Jelly : 421 Kg/ M 3
River sand : 735 Kg/ M 3
Total water : 200 Kg/ M 3
Admixture : 0.7%
Fresh concrete density: 2400 Kg/ M 3
Note: sand = 735 + 2%, Water = 200- 14.7 =
185.30,
Admixture = 0.7%
M40 ( 1 : 1.67 : 2.39)
Cement : 430 Kg/ M 3
20 mm Jelly : 618 Kg/ M 3
12.5 mm Jelly : 412 Kg/ M 3
River sand : 718 Kg/ M 3
Water Cement ratio : 0.43
Admixture : 0.7%
Note: Sand = 718 + Bulk age 1%
M45 ( 1 : 1.58 : 2.26)
Cement : 450 Kg/ M 3
20 mm Jelly : 626 Kg/ M 3
12.5 mm Jelly : 417 Kg/ M 3
River sand : 727 Kg/ M 3 + Bulk age 1%
Water Cement ratio : 0.43
Admixture : 0.7%
M50 ( 1 : 1.44 : 2.23)
Cement : 450 Kg/ M 3
20 mm Jelly : 590 Kg/ M 3
12.5 mm Jelly : 483 Kg/ M 3
River sand : 689 Kg/ M 3 + Bulk age 12%
Water Cement ratio : 0.36 (188 Kg)
Admixture : 1.20%3
Micro silica : 30 Kg
Super flow 6.7% of cement
| Is This Answer Correct ? | 47 Yes | 13 No |
Post New Answer View All Answers
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
What is meant by Crystal Concrete?
Explain what is progress payment?
how much repeitation for conventional and maivan formwork?
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
What is the best type of wood glue?
Are cruise ships built for the transatlantic run?
What is the use of extruded feature in solidsworks?
howto calculate the quantities of material used in fly ash brick after finding the volume??
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
why we use aggregate,sand with cement in concrete?
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you