Sir i completed diploma in electrical from govt. Polytechnic dhanbad (jharkhand) . In 2012 . Now i am working in sail iisco plant . Sir i want to get electrical supervisory certificate for applying in ongc . From where i get this certificate please guide me procedure step by step
Answer Posted / prasad
Dear Friend,
Supervisory Certificate will be issued by State Electricity licensing board.
Eligibity to get this Certificate :
Min 2-3 years experience in any Registered and 'A'grade licenced company as an electrical Supervisor.
after that you have to pay challan fee for a test
if you pass the test you will get a certificate and shall be renewal for every five years.
LV upto 1000vac HV 11kV, mv 33kv, ehv 132 kv
goodluck!
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
what is the control circuit for operating the clean room air shower
What is the alternate solution for testing of polarity by using polarity tester while its milli ammeter does not works?
Why phase sequence must be same in any ht motor or generator circuit?if phase sequence doesn't same whatever will be affect on circuit?
Why lose 1 phase voltage in 33kv to 415v stepdown transformer
what is the illumination level required for child play area?
Whether should be the oil level in OCTC transfomer? It should be upto winding immersed completely or should be upto tap changer s/w? How it will affect the performance of the transformer. Rating may be 33KVA
On what basis the the size of Lightning arrester for buildings are selected ?
What are the differences between single phase and three phase?
he compression ratio for a petrol engine generally lies between
How to improve fuel cell in a distribution system?
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
what is the differencce inn series and cascade connection??
how we can calculate power factor in single phase & three phase ?thank u
ELECTRICAL ENGINEER TEST IN FEWA ANY ONE HAVE KNOWLEDGE ABOUT THIS?????????
Circuit diagram of tube light without starter using electrical choke