Sir i completed diploma in electrical from govt. Polytechnic dhanbad (jharkhand) . In 2012 . Now i am working in sail iisco plant . Sir i want to get electrical supervisory certificate for applying in ongc . From where i get this certificate please guide me procedure step by step

Answer Posted / prasad

Dear Friend,
Supervisory Certificate will be issued by State Electricity licensing board.
Eligibity to get this Certificate :
Min 2-3 years experience in any Registered and 'A'grade licenced company as an electrical Supervisor.

after that you have to pay challan fee for a test
if you pass the test you will get a certificate and shall be renewal for every five years.
LV upto 1000vac HV 11kV, mv 33kv, ehv 132 kv

goodluck!

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the control circuit for operating the clean room air shower

1729


What is the alternate solution for testing of polarity by using polarity tester while its milli ammeter does not works?

1514


Why phase sequence must be same in any ht motor or generator circuit?if phase sequence doesn't same whatever will be affect on circuit?

1717


Why lose 1 phase voltage in 33kv to 415v stepdown transformer

1313


what is the illumination level required for child play area?

1613






Whether should be the oil level in OCTC transfomer? It should be upto winding immersed completely or should be upto tap changer s/w? How it will affect the performance of the transformer. Rating may be 33KVA

1402


On what basis the the size of Lightning arrester for buildings are selected ?

1103


What are the differences between single phase and three phase?

1529


he compression ratio for a petrol engine generally lies between

698


How to improve fuel cell in a distribution system?

1517


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

1559


what is the differencce inn series and cascade connection??

4231


how we can calculate power factor in single phase & three phase ?thank u

1556


ELECTRICAL ENGINEER TEST IN FEWA ANY ONE HAVE KNOWLEDGE ABOUT THIS?????????

557


Circuit diagram of tube light without starter using electrical choke

3643