why prds line tapping taken from ms line as Pri SH O/L temp & pressure is sufficient to full fill our requirement of PRDS..
Answer Posted / vikram thakur
if tapping is after primary super heater than it may cause starvation to secondary super heater, thus secondary super heater will get over heated due to lack of supply of feed water.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
can dp type level transmitter work in under vaccum condition
How We Calibrate the vaccum transmitter?
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
explain how the third harmonic content of the magnetising current affects transformer design
what is restricted earth fault explain in details
How do you consider that you can improve and what assistance do you need to achieve this
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
procedure of how to generate power in solar plant.
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
Why superheated are started before I'd and rd fan?
How to calculate power press toneage
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.