How to take measurement of plastering beam and column.
Answer Posted / shadavali123@gmail.com
If the take column and beam plaster the are taken plaster sqm or sqf
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
Consumption of Binding wire for fixing of cover block in vertical surface
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
Define different types of roof systems?
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
Why the finite element method is lower bound solution?
What are the applications of cad?
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
I need old MMUP exam question and answer for Civil engineering
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
What ingredients with% found in ppc cement??
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)