what is the ratio of M10,M20,M30,M40,M50,M60 grade concrete

Answer Posted / siva

M5-1:5:10;
M7.5-1:4:8;
M10-1:3:6;
M15-1:2:4;
M20-1:1.5:3;
M25-1:1:2;
M30-1:1:3; 

Is This Answer Correct ?    2 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1647


what motivates you to do a good job

2425


How many cum of 9.5mm stone in 1 ton ?

2102


What is the basic difference between OPC

1430


Which are the top apps for you civil engineering?

686






Floor tile measurement? Wall to wall or skirting to skirting

1373


If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?

1263


How to do base isolation using ETABS software?

2488


Can we apply curing compound on ceiling (slab Bottom)

364


WHAT IS YOUR EXPECTED SALARY?

1627


Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot

1831


How can i display 5 asterisk and another 5 asterisk )?

2078


What are the advantages of cad?

643


can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density

1700


rate analysis hiring of generator 62.5 KVA

1682