grade of cement used for plastering? why?
Answer Posted / kk
OPC 43grade or PPC 43 grade for plaster
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Which IS Code/American Code applied for coupler test of steel
What is the method of soil replacement test?
Please design 12.5m long dubbly beam
What materials were used to build the golden gate bridge?
What is the difference between Grade I, II and III of GSB?
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
What is progress payment?
what is the Asfalt test?in road constraction..?
Explain soil analysis?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
How much quantity of cement,sand,stone used to build 1 cum of cc road??
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
what is shuttering co efficient?