While Calculating Quantity Of cement,sand,Metal we get cement in no of bags,Where Sand & Metal we get in Meter Cube(M3)how to convert it to Units(i.e in no of lorry's or Tractors )

Answer Posted / divusp

By knowing the tractor/ lorry capacity we can convert it in to no of lorry / tractor.
Ex tractor 80-100cft.
Lorry 350-650 cft.
Hope u got......

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2360


How to calculate the crank rod in slab

1890


What is the usage of zoom command?

678


Explain what is alternate bid?

781


How to calculate unit weight of concrete for m40 grade.

3423






please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?

1143


Curing time for 1)R.C.C slab 2)B.W 3)Plastering

1640


Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required

1535


Specific gravity of cement?

1201


57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11

9042


How to calculate brick work quantity?? Block work quantity??

2107


what are the duties of Site Engineer in work site?

1156


in plate load test what is the thickness of plate 20mm 5mm 50mm none

1708


how we can find sieve #4 is 4.75mm?

1870


Prepare a Schedule for a Highrised building from starting stage to Handover?

1486