what is mean by bleeding of concrete
Answer Posted / khans
sqeezing out water from fresh concrete is termed as bleeding.it takes place due to excess of water and also because of this the concrete losts its strength
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
Describe the various methods of concrete curing?
silt%= silt volume/ silt+sand volume is this right?
Explain different types of rcc pipes.
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what is called the inverd level of mabhole chamber?
How is calculate the cube molt
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
What is Rankine Cycle?
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
How to do rate analysis for concrete work including shuttering work?
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
What is thumb rule in quantity and cost estimation of a residential building?