Answer Posted / bubai73
IRC 456 is a code for plain and reinforced concrete (code of practice
but IRC 15 is a code for construction of concrete road
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
What is Base Shear ?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what is difference between GTS bench mark and temporary bench mark
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
difference between trapezoidal and pedestal footing and how the load acts on that
How to calculate chejja reinforcement
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
how to shuttering is used in slab
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
how clculate excavated or backfilling quantity by simpson's rule
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building