what is mean by bleeding of concrete
Answer Posted / javed dawar
Bleeding of concrete occur due to excess of water ,by the excess of water the cementious material wash out. and due to this concrete lost their strength.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
2. What are the advantages of your present job, things you like about it?
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
what discoveries did you have in relation to your course?
what is the clear cover for shearwall?
what is called Bulk Density of aggregate?
I need old MMUP exam question and answer for Civil engineering
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
Slab quantityÂ
How do you calculate the unit weight of concrete?