Before erect the instrument what should you do?
Answer Posted / fazil
one should have work permit..operator will control the signal manually.. close primary valve and manifold also
drain existing liquid or gas by drain plug.
remove termination and glanding also tape it to avoid short.then you can remove instruments
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
give me all the details about the interview and which type of question being asked
what is temperature compensation?
What are the materials available to prepare individually for competetive exams in Instrumentation field? Plz reply...
Calibration procedure for electro magnetic flow meter
what is the procedure of belt scale calibration?
How to calibrate radar type level transmitter for interface level? Total liquid(liq.1 and liq.2), level both the liq individually? For. Both the liquid levels how the signal will go from transmitter to dcs? How to calibrate. Single radar 9:26:55 AM for 2 different liquids in a tank?
1.can you use SCADA instead of DCS,DCS instead SCADA 2.Difference between DCS and PLC,can their role be reversed i.e. role interchange 3.Difference between RTU and PLC
Please tell me details about Sox,Nox,SWAS analyser????
what is the difference between scaler and vector drive
what is maxdna ?. explain about the software details.
What is super thermocoupal?
how to calibrate mass flow meter (Coriolis)? Example calibration range: 0 to 2500 kg/hr line size 3" fluid: Etheline glycol (MEG)
you must show the examples application and give at least 4 types of transducer/sensors that can minimize the failure during the manufacturing of the resistors.
How the warning lamp of a charging-system is activated ?
What is sensitivity in vibration probes..?