Post New Answer View All Answers
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
What are the types of slump?
Define What is a kip?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
why development length = 50D . why not 100D
Please tell me vasthu room sizes. Thanks.
how do you calaculate the total steel quantity of an rcc building using thumb rule?
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
What are the Types Of DPC and its Thickness used?
What are the ingredients of pre-stressed concrete?
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr