which"s we should use for concrete ppc or opc?
Answer Posted / vinod1881
PPC Means...Portland Pozzolana Cement
it is used in general concrete works
OPC Means ...Ordinary Portland Cement
it is used in all type of concrete works such as Reinforced concrete works
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what is the effect of duration of earth quake on framed structures ?
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
What are the strongest shapes in building?
how much repeitation for conventional and maivan formwork?
What is the Null Point of chimney in Power Plant
Define a polyline?
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
how to calculate the strength of rebound hammer test reading in building construction ?
How to find CN by using arcgis 9.3?
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
how to calculate weight of 1.8 cum of aggregate
how to calculate mivan shuttering matrial
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
What is OSHA compliance?