10mm Rebar total 12meters length how to calculate ?
Answer Posted / vinod1881
10mm bar 1m length=0.617 kg/m
For 12 m length =0.617×12=7.407 kgs
formula=(d×d)/162.2
d= dia of bar
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
1m square 20mm plastering how much of water need curing work
What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
What is the significance of cost estimate knowledge for an architect?
Define What materials were used to build the Golden Gate Bridge?
What is type failure of road surface? how to repair the failure of road surface?
What is the Maximum %age of Steel in columns and beams ?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
trapozidal
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
reinforcement slab, beam and column formulas?
Which purpose we use deck anchor in bridges?
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft